Hi,
how to schedule an sqr in process schedular
thanks in advance

Harsha's picture
Harsha (not verified)
Re: SQR

Hi Anitha,
Below are the steps to schedule a SQR report through the Process Scheduler

Process Scheduler:
Scheduling a Process :
-->Click on People Tools
-->Process Scheduler->Processes
-->Click on Add a New Value
-->Select the process type as SQR Report.
-->Enter the process name
-->Click on ADD
-->Select the Process Definition tab
-->Select the Run control ID that u have created for the existing project
-->Select the Process Groups as ALL PAGES
-->Save it

Guest's picture
Guest (not verified)
Re: SQR

Hi,
Thanks for ur response
i did up that step
but
where can i see
the out put?
I excecued the runcontrlo page
and i clickd on RUN Button ..
but i am seing only my AE process in process list not SQR
in "Report Manger" also I am unable to see my SQR Report status

Harsha's picture
Harsha (not verified)
Re: SQR

Hi Anitha,
You can see the SQR out put in View Log/Trace ancd click on the PDF url.
Did you give the process name correctly (EX: your SQR name.SQR)
Did you include the SQC's in your SQR program? ()
Check with the runcontrol parameters in your SQR

And also check weather you have included the below in your SQR .

Begin-PROGRAM
do Init-DateTime
do Init-Number
do Get-Current-DateTime
do Stdapi-Init
do Process-Main
if $prcs_process_instance='' or $prcs_process_instance=' '
do Get-Values !runs from the desktop
else
do Select-Parameters !runs from Process scheduler
end-if
do Stdapi-Term
End-Program

Running a Report through the Process Scheduler
-->Open the PS Sign on page
-->Click on PeopleTools
-->Click on Process Scheduler
-->System Process Requests
-->Click on Add a New Value (Ex:1)
-->Click on Add
-->Click on Run
-->Select check box Cross reference window listing. (SQR Reports)
-->Click on Ok.
-->Click on Process Monitor (to check the Process status)
-->Click on Details on any of the running / completed Process.
-->Click on View Log/Trace
-->Click on PDF Url

Guest's picture
Guest (not verified)
Re: SQR

Hi,
Its very usefull
thanks alot first
..
My sqr is
! sc.sqr

Begin-PROGRAM
do Init-DateTime
do Init-Number
do Get-Current-DateTime
do Stdapi-Init
do Process-Main
if $prcs_process_instance='' or $prcs_process_instance=' '
do Get-Values !runs from the desktop
else
do Select-Parameters !runs from Process scheduler
end-if
do Stdapi-Term
do proc1
End-Program

begin-procedure proc1
print 'hi' (1,3,12)
end-procedure proc1

but still i am unable to see my sqr in process schedule request page

Guest's picture
Guest (not verified)
Re: SQR

Eventhoguth my sqr is having bugs
it should display in Process request page ..

Harsha's picture
Harsha (not verified)
Re: SQR

Hi,

You have to insert some SQc's in your SQR program. I'm modifying the SQR given by you. Analise the SQR and Try it.

#include 'setenv.sqc' !Set environment
#include 'setup32.sqc' !printer and page-size initialization

!****************************************************** *****************
Begin-PROGRAM
!****************************************************** *****************

do Init-DateTime
do Init-Number
do Get-Current-DateTime
do Stdapi-Init

do Process-Main
if $prcs_process_instance='' or $prcs_process_instance=' '
do Get-Values !runs from the desktop
else
do Select-Parameters !runs from Process scheduler

end-if

do Stdapi-Term

End-Program

!**************
Begin-HEADING 15
!**************

Print 'MY SQR REPORT' (6,63) bold

!**************
END-HEADING
!**************

!**************
End-PROGRAM
!**************

!*********************************
Begin-Procedure Select-Parameters
!*********************************

Print 'This is an sample SQR program (RunNed through the process scheduler)' (15,6) Bold

!***********************************************************************
End-Procedure Select-Parameters
!***********************************************************************

!**************************
Begin-Procedure Get-Values
!**************************

Print 'This is an sample SQR program (RunNed through SQRW window)' (15,6) Bold

!**************************
End-Procedure Get-Values
!**************************

!****************
Begin-footing 4
!****************
Print 'MY SQR REPORT ENDING' (4,10) bold

!*****************
End-footing
!****************

!****************************************************** *****************
#Include 'stdapi.sqc' !Update Process API
#Include 'curdttim.sqc' !Get-Current-DateTime procedure
#Include 'datetime.sqc' !Routines for date and time formatting
#Include 'number.sqc' !Routines to format numbers
!#Include 'reset.sqc'

Guest's picture
Guest (not verified)
Re: SQR

I changed my sqr it's working fine when i am running from SQRW window...
But from process schedular
I opend the run control page
and clicked on the run button...
but
My sqr is not there in the process list
wht might be the problem?

thanks alot for ur valuavle posts..

Harsha's picture
Harsha (not verified)
Re: SQR

Hi,
Rename your SQR (Ex: abc.sqr) and place it in the server (SQR folder). And follow the below process again.

Process Scheduler:
Scheduling a Process :

-->Click on People Tools
-->Process Scheduler->Processes
-->Click on Add a New Value
-->Select the process type as SQR Report.
-->Enter the process name
-->Click on ADD
-->Select the Process Definition tab
-->Select the Run control ID that u have created for the existing project
-->Select the Process Groups as ALL PAGES
-->Save it

Running a Report through the Process Scheduler
-->Open the PS Sign on page
-->Click on PeopleTools
-->Click on Process Scheduler
-->System Process Requests
-->Click on Add a New Value (Ex:1)
-->Click on Add
-->Click on Run
-->Select check box Cross reference window listing. (SQR Reports)
-->Click on Ok.
-->Click on Process Monitor (to check the Process status)
-->Click on Details on any of the running / completed Process.
-->Click on View Log/Trace
-->Click on PDF Url

Guest's picture
Guest (not verified)
Re: SQR

I did but same problem..

anithan's picture
User offline. Last seen 10 years 30 weeks ago. Offline
Joined: 06/29/2010
Posts: 31
Re: SQR

hi,
I got it
It's a chache problem.
Thanks
a lot
for ur response
onceagain
thnaks,
anitha

nagarjun.2389's picture
User offline. Last seen 10 years 15 weeks ago. Offline
Joined: 08/05/2010
Posts: 4
Re: SQR

HI my sqr it's working fine when i am running from SQRW window...
I opend the run control page
and clicked on the run button...there i can see my sqr
and next when i click on process monitor i am unable 2 see the process instance and weather it is success or not
can u help me what is the problem

thanks in advance