Hi ,
We are upgrading from HRMS 8.8 to HCM 9.0.
In the existing 8.8 system we used to run cobol PSPACCRL(Leave Accrual) from unix command line and it used to work well.
Now in 9.0 when i run the cobol from command line, it hangs and status remains as processing...if I run the cobol from delivered Run control component cobol is running as expected.
Does any one of you has ever faced similar issue.
Title | Under | Posted on |
---|---|---|
Component interface Error: no rows exist for the specified keys | PeopleSoft Technical | 03/15/2019 - 3:54am |
ADD 24 months starting from current month.(peoplesoft) | PeopleSoft Functional | 07/29/2018 - 8:44pm |
TRC values dropdown | PeopleSoft Technical | 04/04/2018 - 12:54am |
how to find missing sequence in GRID and print the mising sequence number while saving through peoplecode | PeopleSoft Technical | 09/11/2017 - 4:49am |
how did you run a cobol program (for peoplesoft) from unix command-line?...is posible to use the exec function in people for that... (the problem is i need to run a cobol from peoplesoft app engine - not a module...entire cobol)